When Travelodge embarked on the development of a new hotel in Darlington Energy Gain UK undertook the analysis of the energy losses for the proposed building and presentation of findings on building compliance and renewable energy options to meet a 10% contribution.
The Process
Instruction Energy Analysis Report
Scope Analysis of the energy losses for the proposed building and presentation of findings on building compliance and renewable energy options to meet a 10% contribution.
Key Content
Dynamic Model
The dynamic model was built to evaluate building performance. As a complete analysis tool it allows packages in thermal, energy and carbon performance including Part L compliance, solar and mechanical and electrical design.
Engineered Energy Solution
Numerous cases were modelled and a number of technologies analysed including: gas boilers, electric space heating, solar PV, solar thermal, CHP, biomass, lighting controls, MVHR and Optimisation. The results were analysed and the optimum solution offered to the client considering: end user requirments, financial returns, capital expenditure, whole life management, space and planning requirements.
Annual Carbon Benefit 0.43t CO2