Tameside Council Building

Facts and Figures

Client – Tameside Council 

Solar Photovoltaics 

System Size – 18.1 KWp

Generation Per Annum – 15,250 KWh

Expected Payback Period – 4 Years

Carbon Savings – 70 Tonnes over 20 Years

Tameside Metropolitan Borough Council is the local authority of the Metropolitan Borough of Tameside in Greater Manchester, England. It is a metropolitan district council, one of ten in Greater Manchester and one of 36 in the metropolitan counties of England, and provides the majority of local government services in Tameside.

solar (4)

vygon UK

503kWp Solar Photovoltaics
mi vehicle integration case study

Mi Vehicle Integration

Leyland

solar (8)

Camster Herbs

260 KWp Solar Photovoltaics