Harry Peers sTEELWORKS Ltd

Facts and Figures

Client – Harry Peers Steelwork Ltd

Solar Photovoltaics 

System Size – 90 KWp

Generation Per Annum – 195,000 KWh

Expected Payback Period – 2 Years

Carbon Savings – 980 Tonnes over 20 Years

EGUK were instructed to correct the works installed by a different contractor.

Following on-site inspections and testing a report was produced identifying the faults and remediation works required.

Access was arranged and the remedial works were completed.

Harry Peers Steel were extremely happy with the quality of service required

 

Further to our call can I formally extend our thanks to you and the EnergyGain team for the works carried out at our premises.

The reinstatement works on the existing 99.9Kw system involving 2 Solis Inverters, Switchgear, Cabling and all other associated works was carried out with the utmost professionalism and the highest safety standards 

The Guys who carried out the works were courteous, always on time and left the area in a tidy state. Should you wish to use Peers as a case study/testimonial, please feel free. Look forward to working with you and the team again should the opportunity arise.