The Challenge
The project involved more than simply installing solar panels onto an existing commercial roof. The condition of the existing roof meant that it first needed to be upgraded to provide a suitable long-term foundation for the new PV system. At the same time, the works had to be carefully coordinated around MI Vehicle Integration’s ongoing manufacturing and vehicle assembly operations.
Upgrading the Existing Roof
Before the solar PV system could be installed, the existing roof required upgrading. As part of the project, a new inverted roof system was installed, providing an improved roof build-up and creating a suitable surface for the installation of the 940kWp solar PV system.
This approach allowed the roof upgrade and solar installation to be considered as part of the same project, helping provide a long-term solution for both the building and its renewable energy requirements.
Working Around an Operational Manufacturing Facility
MI Vehicle Integration operates a specialist manufacturing environment supporting large commercial, off-road and military vehicles.The roofing and solar works therefore needed to be carefully planned around ongoing site activities, vehicle movements, access requirements and manufacturing operations. Maintaining safe access and minimising disruption to the client’s day-to-day activities were key considerations throughout the project.
Integrating a Large-Scale Solar System
Once the roof upgrade was completed, Energy Gain installed a 940kWp solar PV system comprising 1,774 panels. The scale of the installation required detailed engineering and coordination across the roof area, including panel positioning, electrical infrastructure, inverter locations, cable routes and future maintenance access.
Our Solution
Energy Gain worked alongside the wider project team to deliver the roof upgrade and subsequent solar PV installation as part of a coordinated programme of works. The existing roof was upgraded through the installation of a new inverted roof system, providing a renewed roof surface suitable for the long-term installation of the solar PV system.
Following completion of the roof works, Energy Gain installed the 940kWp commercial rooftop solar PV system, comprising 1,774 panels. The system was designed to make effective use of the available roof space while considering the site’s existing electrical infrastructure, access requirements and ongoing manufacturing operations.
The completed installation provides MI Vehicle Integration with a significant source of renewable electricity generated directly at its manufacturing facility, helping reduce reliance on grid-supplied energy. The project also builds on Energy Gain’s previous work with MI Vehicle Integration, following an earlier 268kWp solar PV installation at the company’s facility.
Project Results
The completed 940kWp commercial rooftop solar PV system is expected to generate approximately 737.10 MWh of renewable electricity each year. Over its projected lifetime, the system is forecast to generate approximately 17,285.45 MWh of electricity.
The installation is expected to deliver estimated CO₂ savings of 130 tonnes annually, resulting in approximately 3,060 tonnes of total lifetime CO₂ savings. Alongside the renewable energy benefits, the project also provided an opportunity to upgrade the existing roof, creating a renewed roof system designed to support the solar installation over the long term.
Project Statistics
- System Size: 940kWp
- Solar Panels Installed: 1,774
- Annual Generation: 737.10 MWh
- Lifetime Generation: 17,285.45 MWh
- Annual CO₂ Savings: 130 tonnes
- Lifetime CO₂ Savings: 3,060 tonnes
- Roof Upgrade: New inverted roof system
Engineering Insight
This project demonstrates how roof refurbishment and commercial solar PV can be integrated into a single project, particularly where an existing industrial roof requires upgrading before solar can be installed. Rather than installing the PV system onto a roof that required significant improvement, the existing roof was upgraded first through the installation of a new inverted roof system.
This provided a suitable foundation for the solar installation while addressing the longer-term requirements of the building.
The solar system was engineered to:
- Maximise the use of suitable rooftop space
- Optimise annual renewable electricity generation
- Work with the new inverted roof system
- Integrate with the site’s existing electrical infrastructure
- Provide appropriate access for future maintenance
- Optimise inverter and cable positioning
- Support reliable long-term system performance
The project highlights the importance of considering the condition of the existing roof at the earliest stages of commercial solar planning. Where a roof requires refurbishment or replacement, coordinating the works with a new solar installation can provide an opportunity to address both requirements as part of a wider project.
Solar and Roof Refurbishment for Industrial Buildings
For businesses considering commercial solar, the condition and remaining lifespan of the existing roof are important considerations. A roof survey can identify whether the existing structure is suitable for a solar installation or whether refurbishment or replacement should be considered before PV is installed. Where roof works are required, combining the refurbishment with a new solar PV system can provide a coordinated approach to upgrading the building while introducing on-site renewable energy generation.
For industrial and manufacturing businesses, this can provide an opportunity to:
- Upgrade an ageing roof
- Make better use of available roof space
- Generate renewable electricity on-site
- Reduce reliance on grid energy
- Lower operational carbon emissions
- Support long-term energy and sustainability objectives
The MI Vehicle Integration project demonstrates how an industrial roof upgrade and large-scale solar PV installation can be delivered together, creating a long-term solution for both the building and its energy requirements
Looking to Install Commercial Solar?
Energy Gain delivers commercial solar PV systems for manufacturing businesses, industrial facilities and other energy-intensive organisations across the UK. As part of the feasibility process, our engineering team can assess your existing roof, electricity consumption, available roof space and wider site requirements to establish the most appropriate approach for your project.
Where a roof requires refurbishment or upgrading before solar can be installed, this can also be considered as part of the project planning process.
Contact Energy Gain today for a free feasibility assessment to discover how commercial solar could work for your business.