When Travelodge were planning the development of a new venue in Cheshire Energy Gain UK were commissioned to provide a full energy compliance report, design, supply, install & commission a Solar Photovoltaic System. Travelodge needed to ensure that they met Sbem renewable calculations, as well as ensure that running costs were kept to a minimum by implementing the latest energy reduction technologies.

white-space-18

Project Detail

Client Travelodge

Sector Hospitality

Scope Provide Full Energy Compliance Report, Design, Supply, Install & Commission Solar Photovoltaic System

Technology Solar Photovoltaics

Location Chester

Site Details

Capacity 17.60KWp Feed Three Phase

Azimuth 30 Degrees Pitch 35 Degrees

Shading None Access Scaffold

Components

Mounting On-Roof Mounting System Hilti

Solar Modules Sharp ND 220  Qty of Solar Modules 80

Inverter SMA 17000TL  Qty of Inverters 1

Generation Data

Estimated Annual Output    855 KWP/KWh p/a Carbon Saving 7,894 KgCo2e p/a

*Figures based on PVGIS Data *Figures based on 0.5246 KG CO2 per

white-space-18Travelodge Commission Solar Photovoltaic System

partner logos Solar Photovoltaic System

Travelodge-495xsize-6

Other Updates

Enquire or Request a Quote

Working towards a more sustainable future in business

Energy Gain