Trafford Park based Illingworth Ingham (M/cr) Ltd completed a major investment project aimed at significantly reducing their energy consumption, energy costs and reducing their carbon footprint.
A new Solar Photovoltaic system has been installed at the Trafford Park Sawmills after Illingworth Ingham (M/cr) Ltd spent months rigorously searching for the best partners.
The project started with energy profiling and progressed through to design, verification and construction.
The Trafford Park site provides bulk timber supplies to joinery manufacturers, timber merchants, shop fitters, house builders, kitchen, window, door and stair manufacturers through the North of England and Midlands.
The solar panels have a 25 year performance guarantee, with an expected lifetime generation of 40 years. Total green electricity production by the end of that 40 year period is expected to be 6.8 Mega Watt hours.
Simon Graveley, Chairman of Illingworth Ingham (M/cr) Ltd said “We operate in a very competitive market so it is important for us to be able to find cost savings that we can pass onto our customers and use to reduce our overall running costs.”
We are also very conscious about our impact on the environment so being able to reduce our carbon footprint by 94,428 kg CO2 per annum and 3.6 m KgCO2 over the life time of the panels was another important consideration. Our annual green electricity production will be equivalent to 3,600 trees cleaning the air each year.
Project Detail
Client Illingworth Ingham (M/cr) Limited
Sector Manufacturing
Instruction Design, Supply, Install & Commission Solar Photovoltaic System
Technology Solar Photovoltaics
Location Manchester
Site Details
Capacity 200 KWp Feed Three Phase
Azimuth 0 Degrees Pitch 30 Degrees
Shading None Access Specialist Rope Access
Components
Mounting Solar Module Mounting System Renosol
Solar Modules ET Solar 250 Qty of Solar Modules 800
Inverter Solar Max Qty of Inverters 12
Monitoring Inverter Level & GSM Meter
Generation Data
Estimated Annual Output 905 KWP/KWh p/a
Project Notes
- Asbestos Roof - Rope Access
- Mounting of 12 x Inverters - Roofit Application
- Health & Safety Visit with 100% Satisfaction - Training/ Education